模具英語(yǔ)常用100句,模具人都要學(xué)學(xué)。。

2016-11-30  by:CAE仿真在線(xiàn)  來(lái)源:互聯(lián)網(wǎng)



1.All in English & Imperial Unit. 全部使用英文和英制單位。


  2. Are part dimensions to print plus shrink?請(qǐng)檢查內(nèi)模尺寸有否乘縮水?


  3. All wires protected from sharp corners?凡有電線(xiàn)通過(guò)的角位要改為R角,是否完成?


  4. All replaceable components must bestandard components. 所有替換的元件必須是標(biāo)準(zhǔn)件。


  5. Add shot counter?是否加啤塑總計(jì)器?


  6. A complicated mould with thorough designconsideration toovercome the numerous design contraints. 一個(gè)復(fù)雜的模具,設(shè)計(jì)經(jīng)過(guò)周詳考慮,成功地克服了各種設(shè)計(jì)上的限制。


  7. All moving components should usehardened steel : all slidesshould be installed with hardend or lubricated alloywear plates and gibs, andwith positive slide retainer. 所有移動(dòng)的零件應(yīng)使用硬鋼料,行位必須用硬墊板和硬線(xiàn)條,而且必須有限位及定位鎖。


  8. BOM including waterfittings,ejectors&custom components. BOM的內(nèi)容應(yīng)包含運(yùn)水接頭,頂針和自制的零件。


  9. BeCu for lifters if w/o water circuits。若沒(méi)有運(yùn)水回路,斜頂為鈹銅。

模具英語(yǔ)常用100句,模具人都要學(xué)學(xué)。。moldflow圖片1

  10. Corresponding components mirrored atcore&cavity. 對(duì)應(yīng)的部件在前、后模平面視圖中鏡像。


  11. Check polish for line of draw finish?有否省光就出模?


  12. Core pull slot mechanism installed andO.K.


  13. Crane capacity and loading clearance. 模具須用多大吊機(jī)才可搬動(dòng)。


  14. Conduct moldflow&mold warpanalysis. 經(jīng)流道及變形電腦模擬分析。


  15. Component and/or 3D mould designdrawing. 散件圖或3D模具圖。


  16. Cooling less important when dimensionsare not important. 若尺寸不重要,適量冷卻也可。


  17. Combine a traditional 4 cavity edgegate and a 4 cavitiesreverse gate mould which help to double the mouldingcapacity and reduceproduction cost. 將一個(gè)標(biāo)準(zhǔn)四模腔大水口模具與一個(gè)四模腔倒轉(zhuǎn)大水口模具結(jié)合成為一套可于同一大小的注塑機(jī),生產(chǎn)量可增加一倍的層板模具,并且可降低成本。


  18. Can be seperated into two individualmoulds for moulding in twodifferent mould shops. 此模具最大的特式是,可將模具分開(kāi)變成兩套,在不同地方生產(chǎn),增加生產(chǎn)的靈活性。


  19. Consists of all standard mouldcomponents which facilitatesmould maintenance. 由于全套模具均利用模具標(biāo)準(zhǔn)零件制成,在維修及換零件上比較方便。

模具英語(yǔ)常用100句,模具人都要學(xué)學(xué)。。moldflow分析圖片2

  20. Die draw called out 出模方向的標(biāo)示


  21. Dimension all the opening , travel& clearance. 標(biāo)出前、后模距離,滑動(dòng)部件滑動(dòng)距離和塑件脫離的位置。


  22. DME egr. Water fittings recessed andmarked?是否使用DME運(yùn)水接頭及編號(hào)?


  23. Delivery right side up , or in twohalves?開(kāi)箱后是否容易吊出模具及是否分開(kāi)前/后模運(yùn)輸?


  24. Eyebolt size and balance in 2 sides. 吊??壮叽?平衡,4邊都要有。


  25. Ejection stroke & slide, liftertravel dimensioned. 出行程、行位、斜頂行程的標(biāo)注。


  26. Ejection study if lifteradopted. 若有斜頂,做出分析。


  27. Ejection extended at the most. 頂出到極限位置。


  28. Ejector guide pins installation. 頂針導(dǎo)柱的安裝。


  29. Eyebolts for inserts more than 50lbs. 重量大于50lbs的鑲件必須要有吊???。

模具英語(yǔ)常用100句,模具人都要學(xué)學(xué)。。moldflow分析圖片3

  30. Edge gate or sprue gate requiringsecondary operationacceptable. 邊緣型或直入型水口都可以接受。


  31. 4 point in HRC different to lifterscontacting or cavity steel. 斜頂和與其接觸的內(nèi)?;蜩偧谟捕壬嫌?度的差別(HRC)。


  32. 4X size section , dimensioned toreflect the actual size. 水口及水口頂針的4倍放大視圖,按實(shí)際尺寸標(biāo)注。


  33. General ,safety and handling. 常規(guī)、安全和搬運(yùn)要求。


  34. Guided ejection recommended for mouldabove 100 tons clampcapacity, ejector pins of 1.5mm or smaller, or ejectorstroke longer than 50mm. 建設(shè)模具用于鎖模力超過(guò)100噸的注塑機(jī),或有1.5mm以下的頂針或頂出行程超過(guò)50mm時(shí),應(yīng)裝上頂針板導(dǎo)柱。


  35. Guide pin cleared and vented?邊釘插入模板有否頂著及加疏氣空?


  36. Hot manifold wired to print and checked?熱咀電線(xiàn)接位有否編號(hào)?


  37. Horn pin clearance hole?斜邊與行位有否空間?


  38. Hydraulic actuated slide together withelectrical limit switch. 行位采用油壓推動(dòng),配合安全電制。


  39. Heaters fitted+0.002/-.000, leadstagged and connected toterminal. 熱嘴裝配,電線(xiàn)源頭、尾有否安裝穩(wěn)固。(+0.002/.000)。

模具英語(yǔ)常用100句,模具人都要學(xué)學(xué)。。moldflow仿真分析圖片4

  40. Inserts keyed and numbered to preventincorrect assembly. 鑲件定位和編號(hào)以防止不正確的組裝。


  41. Jaw angle 3 deg.more than anglepins(<25 degree). 斜面角度要比行位斜邊角度大3度(<25度)。


  42. Keep enough space to run waterline atslide /lifter/majorinserts. 在行位、斜頂、主要鑲件處保留足夠位置(空間)布置水槽。


  42. Lifter angle less than 15 degree. 斜頂角度小于15度。


  43. Lifter rods dia, less than 1". 斜頂桿直徑不能少于1"。


  44. Limit switch in tact and protected. 是否已安裝限位制?


  45. Moldbase and steel dimensioned. 模坯和鋼料號(hào)的標(biāo)注。


  46. Minimum 5 deg.for shut-off. 斜頂鑲件最小5度插穿。


  47. Mechanism for sequence?動(dòng)作機(jī)構(gòu)是否正確?


  48. Mold safety straps installed andpainted red?是否已安裝安全帶及噴上正確顏色在模坯上?


  49. Mould flow and simulation should becarried out for the bestgate location, filling analysis, pressure distributionand heat distribution. 適宜應(yīng)用模擬的模具注塑過(guò)程,注射分析、壓力分布及溫度分布以確定最佳入水位置、流道尺寸和疏氣位置等。


  50. Mould should be designed with maximumcooling and withappropriate amount of ejection points. 模具在設(shè)計(jì)上要做到盡快冷卻,上、下內(nèi)模高溫點(diǎn)應(yīng)該有個(gè)別的冷卻,應(yīng)有適量頂針。


  51. Mould should be able to run fullyautomatic. Large part shouldbe picked up by robot. 模具能夠全自動(dòng)生產(chǎn),大的零件應(yīng)由機(jī)械手拿出。


  52. Mould should be tested to meet adefined Cpk quality standard. 模具經(jīng)過(guò)測(cè)試,符合預(yù)定的Cpk質(zhì)量標(biāo)準(zhǔn)。


  53. Mould should have safety features toprotect accidental damage,incorrect assembly and set up of mould. 模具應(yīng)具備可以預(yù)防意外損害及錯(cuò)誤安裝等安全特性。


  54. Mould halves requiring accuratealignment of core and cavity,and shut off should have appropriate part linelocks. 上、下模需要精確配合或有擦位的地方,模具一定要有直身鎖。


  55. Mould requiring heating should haveinsulator plate. 需要加熱的模具,必須有隔熱板。


  56. Mould preferred to run automatic;self-degating wheneverpossible. 模具最好能自動(dòng)生產(chǎn),模具盡可能自斷水口。


  57. No obstructions on buttom surface ofmold?模具必須穩(wěn)定位置如有凸出物請(qǐng)加腳座,是否完成?


  58. Overall mold size of the moldbase &shut height 模坯長(zhǎng)寬和模厚(模架的長(zhǎng)寬)


  59. Outlets accessible and marked " INOUT and NUMBER"?出入水位有否打上IN 、OUT 字碼?

模具英語(yǔ)常用100句,模具人都要學(xué)學(xué)。。moldflow結(jié)果圖片5

  60. Protruding items shown and protected. 畫(huà)出突出部件并做好保護(hù)。


  61. Parting line at the acceptable surface.合模分布在合理可接受的表面。


  62. Put waterline as much aspossible/wherever possible. 盡可能布置多的運(yùn)水。


  63. Put waterline for slide /lifter/insertwherever possible. 盡可能在行位、斜、鑲件布置運(yùn)水。


  64. Parting line cleared and releasedproperly? 分模線(xiàn)是否正確?


  65. Proper locating ring and diameter?定位圈尺寸及直徑是否正確?


  66. Proper radius and orifice on spruebushing and keyed.唧嘴R及管釘是否正確?


  67. Part line lock recommended when thereis shut off. 當(dāng)有擦位時(shí),最好有直身鎖保護(hù)。


  68. Protruding items shown and protected. 如有零件凸出,模坯請(qǐng)加保護(hù)物。


  69. Proper K.O. holes size and location. 頂棍孔尺寸及位置是否正確?


  70. Runners to be balanced. 流道必平衡。


  71. Runners cross section type and size asper standard. 流道切面形狀和尺寸符合標(biāo)準(zhǔn)。


  72. Runner and parts should be ejectedautomatically .Multipleejection should be avoided. 頂出方法可使流道與產(chǎn)品自動(dòng)掉下,避免運(yùn)用多次頂出方法。


  73. Sufficient view and section. 足夠的視圖和切面圖。


  74. Safety Strap in red. 模塊藏入模坯,要涂成紅色。


  75. Standing steel supported to keepstable. 加撐腳以保前、后模能平穩(wěn)放置。


  76. Support pillars>50% part projectionarea , steel :1040。撐頭面積大于50%的產(chǎn)品投影面積,材料:1040。


  77. Safety strap clear tie bar? 鎖模塊與哥林柱沖突嗎?


  78. Sucker with reverse 10 deg. Undercut.10度倒扣的流道拉料桿。


  79. Steel type & hardness of slide&heel blocks. 行位和壓條的料號(hào)和硬度。

模具英語(yǔ)常用100句,模具人都要學(xué)學(xué)。。moldflow結(jié)果圖片6

  80. Sufficient stroke oflifters(1/16"+ undercut size)?斜頂是否有足夠的行程(1/16”+倒扣尺寸)?


  81. Sufficient stroke for floating plate?浮動(dòng)板是否有足夠的行程?


  82. Sufficient stroke as well as part andrunner falls clear. 是否有足夠的行程使品和流道脫落?


  83. Spring around return pins and pressratio<33? 是否有回針的彈簧及其壓縮比(<33%)?


  84. Special instruction stamped on top andoperator side?客戶(hù)如有特別指示請(qǐng)打在模坯頂及操作面上,有否完成?


  85. Screws tight and all installed?螺絲是否全部收緊?


  86. Support posts ground and screwed toclamp plate and pre-loaded. 撐頭是否高出方鐵?


  87. Spring pockets correct depth , springdeflection max.40%?全部彈弓壓縮比是否為1/3 ?


  88. Standing steel well supported?成品與內(nèi)模之間的鋼材是否足夠?


  89. Single drop of cold sprue gating isdesigned after moldflowanalysis, which ensures a balance flow of plastic andeasy for moulding. 用moldflow分析決定產(chǎn)品的入水位置,使膠料分流平均,易于注塑。


  90. Self-degating whenever possible .Hotrunner system should beconsidered.…… 熱流道系統(tǒng)應(yīng)該加以考慮。


  91. Standard components should be used. 盡量使用標(biāo)準(zhǔn)件。


  92. Semi-automatic and use of mould releaseacceptable. 半自動(dòng)工手放鑲件也可。


  93. Update title block/revision. 更新標(biāo)題欄/版本。


  94. Use standard components whenappropriate. 適當(dāng)?shù)臅r(shí)候使用標(biāo)準(zhǔn)件。


  95. View of deepest point 最深點(diǎn)(位置)的剖切視圖


  96. Water circuits should run out form theejection box. 運(yùn)水應(yīng)從出水槽中流出。


  97. Waterlines clear tie bar and clampslot? 運(yùn)水是否同哥林柱和模槽有沖突?


  98. Will mould fit in quoted press? 可否配合客戶(hù)啤機(jī)?


  99. Waterlines clear tie bars. 運(yùn)水喉咀接駁位要離開(kāi)啤機(jī)呵林柱咀接駁。


  100. Waterline clear clamp slot. 運(yùn)水喉咀接駁位要離開(kāi)啤機(jī)碼??印?


開(kāi)放分享:優(yōu)質(zhì)有限元技術(shù)文章,助你自學(xué)成才

相關(guān)標(biāo)簽搜索:模具英語(yǔ)常用100句,模具人都要學(xué)學(xué)。。 Moldflow分析培訓(xùn) Moldflow課程培訓(xùn) Moldflow注塑分析的塑膠制品應(yīng)用 Moldflow視頻 Moldflow技術(shù)教程 Moldflow資料下載 Moldflow分析理論 Moldflow軟件下載 Fluent、CFX流體分析 HFSS電磁分析 Ansys培訓(xùn) Abaqus培訓(xùn) 

編輯
在線(xiàn)報(bào)名:
  • 客服在線(xiàn)請(qǐng)直接聯(lián)系我們的客服,您也可以通過(guò)下面的方式進(jìn)行在線(xiàn)報(bào)名,我們會(huì)及時(shí)給您回復(fù)電話(huà),謝謝!
驗(yàn)證碼

全國(guó)服務(wù)熱線(xiàn)

1358-032-9919

廣州公司:
廣州市環(huán)市中路306號(hào)金鷹大廈3800
電話(huà):13580329919
          135-8032-9919
培訓(xùn)QQ咨詢(xún):點(diǎn)擊咨詢(xún) 點(diǎn)擊咨詢(xún)
項(xiàng)目QQ咨詢(xún):點(diǎn)擊咨詢(xún)
email:kf@1cae.com